Ramps Logistics has been awarded a fully integrated contract with Tullow Oil for its upcoming drilling campaign in Block 47, Suriname.

The company stated that the contract covers logistics and shorebase operations between Trinidad and Suriname. Ramps will support these drilling operations through shorebase provision and management in both Suriname and Trinidad, inclusive of warehousing, pipe yards, berthing, lifting equipment and labour.

Additionally, Ramps will provide marine agency, customs clearance, immigration and personnel logistics and a host of 3rd party services through local service providers, which includes CCU’s, fuel, sling provision, taxis and apartments.

Ramps will support Tullow’s drilling operations Goliathberg-Voltzberg North well, expected to be started in Q1 2021.

The Stena Forth Drillship will be used during this drilling campaign by Tullow in Suriname.

Stena Forth is a harsh environment, dynamically positioned DP Class 3 drillship capable of drilling in water depths up to 10,000’ using 18 3⁄4” – 15,000psi Cameron TL BOP and Cameron Load King Riser.

Photo credit: https://www.stena-drilling.com/our-fleet/stena-forth/