Keskula: Process safety keeps me up at night

Keskula: Process safety keeps me up at night

The Centre for Chemical Process Safety (CCPS) recently held a one-day meeting in Trinidad and Tobago, featuring a series of presentations from industry professionals engaged in process safety. At the meeting, Heritage Petroleum’s CEO Erik Keskula gave welcoming remarks and started by saying “If there’s something that keeps me up at night it’s process safety”. Heritage Petroleum was the lead sponsor of the event and hosted the event alongside the CCPS. 

Tiger Tanks completes GHG Inventory and Mitigation Assessment

Tiger Tanks completes GHG Inventory and Mitigation Assessment

Tiger Tanks is the first private sector company in T&T to complete an extensive GHG inventory and mitigation assessment. Over the past few months, the company has partnered with the University of Trinidad and Tobago (UTT) to conduct the assessment. This project allows Tiger Tanks to identify key emission sources and equips the company with the tools needed to implement targeted strategies for reducing those emissions.

EMA ends paper-based CEC applications

EMA ends paper-based CEC applications

The Environmental Management Authority (EMA) has launched a new portal for applications for Certificate of Environmental Clearance (CEC). The new Customer Portal for all CEC applications and payments is now live and is available to all CEC applicants. 

Khan: leverage NGC expertise

Khan: leverage NGC expertise

According to most projections, natural gas will play a significant role in the energy mix as the world transitions to lower carbon fuels and renewable energy. The market for fuel like coal and heavy crude will decline, while growth is still expected for natural gas and LNG. 

Touchstone announces initial production from Cascadura C

Touchstone announces initial production from Cascadura C

Touchstone has safely commissioned the flowline connecting the Cascadura C surface location to the Cascadura natural gas processing plant, which ties in our Cascadura-2ST1 and Cascadura-3ST1 wells. Additionally, a new natural gas separator has been installed and brought online, expanding the plant's gross natural gas processing capacity to approximately 140 million cubic feet per day.

Accelerating action to create a sustainable future

Accelerating action to create a sustainable future

The theme of the T&T Energy Conference in 2024 was Accelerating Action. The Energy Chamber picked this theme because there was a strong feeling that the actions needed to create a sustainable future for the sector were known and we were moving in the right direction of travel, but things were simply not happening fast enough. 

Perenco increases footprint in T&T

Perenco increases footprint in T&T

It was recently announced that Perenco would be acquiring five of bpTT’s assets. This is a big step up in Trinidad for the Anglo-French company which has been the operator of the Teak, Samaan and Poui (TSP) fields since they purchased the assets from Repsol in 2016. The acquisition of bpTTs assets means that the company will now be the operator of gas fields, rather than the traditional oil acreage in Trinidad.

bp completes acquisition of Lightsource bp

bp completes acquisition of Lightsource bp

bp has completed its acquisition of the remaining 50.03% interest in Lightsource bp, one of the world’s leading developers and operators of utility-scale solar and battery storage assets.

Paria Secures ISCC Certification: Strengthening Sustainability and Market Access in the Caribbean

Paria Secures ISCC Certification: Strengthening Sustainability and Market Access in the Caribbean

Paria Fuel Trading Company Limited (Paria) is proud to announce its achievement of attaining International Sustainability and Carbon Certification (ISCC), a critical step toward integrating with the European market’s stringent environmental standards. This certification not only reinforces Paria’s commitment to sustainability and transparency but also highlights the broader economic and environmental benefits for Trinidad, the Caribbean region, and their energy exports.

Arrest of the Solo Creed

Arrest of the Solo Creed

The Ministry of Energy and Energy Industries (MEEI) has reported that pursuant to proceedings filed by the Republic of Trinidad and Tobago in the Republic of Angola the tug Solo Creed has been ordered by the Court to be arrested to secure the claim of Trinidad and Tobago.

Mento platform getting ready for sailaway

Mento platform getting ready for sailaway

The Hon. Stuart Young, Acting Prime Minister and Minister of Energy and Energy Industries toured the Mento platform at the TOFCO fabrication yard in La Brea. The platform is in the final stages of construction as it gets ready for sailaway within the coming weeks.

bpTT completes seismic acquisition for the Manakin-Cocuina field

bpTT completes seismic acquisition for the Manakin-Cocuina field

The Honourable Stuart Young met with senor executives from bpTT at the International Waterfront Complex in Port of Spain. At the meeting, David Campbell, President, bpTT indicated that the seismic acquisition for the Manakin-Cocuina field was completed, and the data collected is now at the processing stage. The Minister also received updates on drilling operations at the Cypre development and construction of the 92mw solar project. 

Preliminary work on Dragon gas project has begun

Preliminary work on Dragon gas project has begun

On 11th October 2024, Dr. The Honourable Keith C. Rowley, Prime Minister of the Republic of Trinidad and Tobago and The Honourable Stuart R. Young S.C., M.P. Minister of Energy and Energy Industries and Minister in the Office of the Prime Minister along with representatives from Shell and the National Gas Company visited the Dona Jose 2 vessel at Tembladora Port, Chaguaramas.